North Dakota Reported Work Zones Last Updated at: 8/15/2022 6:43:24 PM I 29 N Interstate @ Exit 50 (Horace Interchange) (MP: 49.700 to 50.500) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 18.0 ft. Comments: Traffic is reduced to one lane in both directions. Expected Start: 04/08/2022 Expected End: 09/01/2022 Key: MA-100347 I 29 N Exit 50 (Horace Interchange) (MP: 50.000 to 50.000) Type of Work: Construction Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Interchange Exit 50 (Horace Interchange) and the cross road (Cass County 18) are closed for Construction. Detour for Cass County 18 is provided. Expected Start: 04/01/2022 Expected End: 09/01/2022 Key: MA-100345 I 29 N 1 mile south of 52nd Ave interchange (MP: 58.865 to 59.651) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Height - 17.5 ft. Comments: Passing lane closed in each direction for bridge work. Expected Start: 06/09/2022 Expected End: 08/30/2022 Key: MA-100357 I 29 N I-29,HUNTER SEP TO NEAR BLANCHARD-SB (MP: 88.270 to 101.527) Type of Work: Reconstruction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 18.0 ft. Height - 16.5 ft. Comments: Head to head traffic is active. Speed reduced to 65 MPH. Northbound traffic will be restricted to 20'. Southbound traffic will be restricted to 14.5'. Southbound traffic will enter head to head at mile 101 at the crossover. Southbound traffic will continue south for 13 miles and exit head to head at the crossover located at mile 88. Traffic is delineated with signs, barriers, barrels, and tubes. Expected Start: 04/19/2022 Expected End: 10/15/2022 Key: CN-21855 I 29 S Interstate @ Exit 50 (Horace Interchange) (MP: 49.700 to 50.500) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 18.0 ft. Comments: Traffic is reduced to one lane in both directions. Expected Start: 04/08/2022 Expected End: 09/01/2022 Key: MA-100347 I 29 S Exit 50 (Horace Interchange) (MP: 50.000 to 50.000) Type of Work: Construction Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Interchange Exit 50 (Horace Interchange) and the cross road (Cass County 18) are closed for Construction. Detour for Cass County 18 is provided. Expected Start: 04/01/2022 Expected End: 09/01/2022 Key: MA-100345 I 29 S 1 mile south of 52nd Ave interchange (MP: 58.865 to 59.651) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Height - 17.8 ft. Comments: Passing lane closed in each direction for bridge work. Expected Start: 06/09/2022 Expected End: 08/30/2022 Key: MA-100357 I 29 S I-29,HUNTER SEP TO NEAR BLANCHARD-SB (MP: 88.270 to 101.527) Type of Work: Reconstruction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.5 ft. Height - 16.5 ft. Comments: Head to head traffic is active. Speed reduced to 65 MPH. Northbound traffic will be restricted to 20'. Southbound traffic will be restricted to 14.5'. Southbound traffic will enter head to head at mile 101 at the crossover. Southbound traffic will continue south for 13 miles and exit head to head at the crossover located at mile 88. Traffic is delineated with signs, barriers, barrels, and tubes. Expected Start: 04/19/2022 Expected End: 10/15/2022 Key: CN-21855 I 29 S North of North Grand Forks Interchange to Walsh County Line (MP: 147.230 to 161.700) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 15.0 ft. Comments: Concrete pavement repair project. Expected Start: 07/08/2022 Expected End: 08/31/2022 Key: MA-100360 I 94 E GIBBS SEP-5 MI E OF W JCT US 83 (MP: 164.527 to 164.527) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Comments: Bridge replacement work has begun, expect reduced speeds and lane closures from RP 164 to 167. Expected Start: 04/04/2022 Expected End: 09/17/2022 Key: CN-21854 I 94 E JCT ND 30 (MP: 228.321 to 228.321) Type of Work: Bridge Repair Work Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: The Bridge on I-94 Jct ND 30 at Exit 228 is being replaced this construction season. Hwy 30 will be closed through the overpass during most of the spring/summer. Traffic traveling north on Hwy 30 wanting to turn west on I-94 will be detoured east to Exit 230, utilizing the ramps, to travel on I-94 west. Traffic traveling south on Hwy 30 wanting to turn east, will be detoured west to Exit 221, utilizing the ramps, to travel on I-94 east. Traffic traveling on I-94, in both bounds, will be diverted on the off/on ramps when overhead work is taking place on the structure. Traffic control signs & devices will be used as necessary to guide the traveling public through the work zones. Expected Start: 04/21/2022 Expected End: 10/15/2022 Key: CN-22485 I 94 E CLEVELAND INT - JAMESTOWN INT (MP: 238.793 to 238.793) Type of Work: Bridge Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: The passing lane at the bridge on I-94 westbound is closed for bridge repair work. Traffic control devices and signs will be used divert motorists accordingly. Expected Start: 06/09/2022 Expected End: 10/15/2022 Key: CN-23011 I 94 E I-94 - Exit 242 - Windsor Interchange (MP: 242.200 to 242.700) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Bridge repair work is being done on the overpass at Exit 242. The road will be closed through the overpass during construction. Traffic traveling on I-94 east, wanting to travel north on exit 242 will be detoured 3 miles east to exit 245 utilizing the interchange ramps to travel back on I-94 west to get to Exit 242 Northbound. Traffic traveling on I-94 west, wanting to travel south on exit 242 will be detoured to exit 238 utilizing the interchange ramps to travel back on I-94 east to get to Exit 242 Southbound. Traffic traveling on I-94, in both bounds, will be diverted on the off/on ramps when overhead work is taking place on the structure. Traffic control signs & devices will be used as necessary to guide the traveling public through the work zones. Expected Start: 08/12/2022 Expected End: 10/14/2022 Key: MA-100367 I 94 E I-94 - Exit 248 - Lippert Interchange (MP: 248.700 to 249.200) Type of Work: Construction Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Bridge repair work is being done on I-94 at Exit 248. The road will be closed through the overpass during construction. Traffic traveling on I-94 east, wanting to travel north on exit 248 will be detoured 3 miles east to exit 251 utilizing the interchange ramps to travel back on I-94 west to get to Exit 248 Northbound. Traffic traveling on I-94 west, wanting to travel south on exit 248 will be detoured 3 miles west to exit 245 utilizing the interchange ramps to travel back on I-94 east to get to Exit 248 Southbound. Traffic control signs & devices will be used as necessary to guide the traveling public through the work zones. Expected Start: 08/12/2022 Expected End: 10/14/2022 Key: MA-100368 I 94 E W OF ELDRIDGE INT TO E OF EXIT 260 (MP: 251.400 to 261.000) Type of Work: Shoulder Work Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 22.0 ft. Comments: Work in the median. Expect lane and shoulder closures. Expected Start: 04/25/2022 Expected End: 08/31/2022 Key: CN-22884 I 94 E I-94 Exit 257 off ramp (MP: 257.002 to 257.002) Type of Work: Construction Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Bridge Repair work will be taking place on the off ramp at Exit 257. The ramp will be closed during construction. Expected Start: 08/12/2022 Expected End: 10/14/2022 Key: MA-100366 I 94 E W OF OAKES INT TO E OF PEAK INT (MP: 288.400 to 297.000) Type of Work: Ditch Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Comments: Expect lane and shoulder closures, speed limit reduced to 65 MPH on both the west and east bound lanes. Expected Start: 05/10/2022 Expected End: 10/15/2022 Key: CN-22885 I 94 E TOWER CITY INTR TO W OF AYR INTR (MP: 307.694 to 314.863) Type of Work: Ditch Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 22.0 ft. Comments: Expect lane and shoulder closures. Expected Start: 06/07/2022 Expected End: 10/31/2022 Key: CN-23327 I 94 E W LYNCHBURG INTR TO E KINDRED INTR (MP: 327.717 to 340.779) Type of Work: Miscellaneous Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Comments: Median Shoulder work, I94 Eastbound, Left Lane closure from RP 335.00 to 336.500. I94 westbound left lane closure from RP 337.335 to RP 335.500 Expected Start: 06/01/2022 Expected End: 10/01/2022 Key: CN-23329 I 94 E 6 EAST OF ND 18 - EB/WB (MP: 337.335 to 337.335) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 15.0 ft. Comments: Both directions of I-94 are reduced to one lane and traffic is head-to-head on the westbound roadway across the Maple River at RP 337. Eastbound speed limit reduced to 40 MPH and westbound speed limit reduced to 55 MPH. Expected Start: 03/23/2022 Expected End: 09/10/2022 Key: CN-22319 I 94 E HORACE RD TO 42ND ST SEP-EB/WB (MP: 346.440 to 349.100) Type of Work: Grading Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Normal Surface Type: Pavement Comments: I94 from the Sheyenne Interchange to 42nd St Separation the inside shoulder is closed. Lane closure on I94 Westbound from the 42nd St Separation bridge to 45th ST Interchange bridge. On I94 Eastbound there is a lane closure from veterans Blvd to 45th ST Expected Start: 07/28/2022 Expected End: 08/31/2022 Key: CN-22443 I 94 E 42ND ST SEPARATION TO I-29 - EB/WB (MP: 349.089 to 349.530) Type of Work: Miscellaneous Delays: Expect Delays Lane Reduction: Reduced to two lanes Travel Speeds: Reduced Surface Type: Pavement Comments: Median Work, I94 eastbound lane closure from RP 348.581 (45th St Interchange Bridge) to RP349.580 (I29 Interchange Bridge). I94 westbound shoulder closures from RP 349.860 to 348.500. Speeds reduced to 40 Mph. Expected Start: 07/11/2022 Expected End: 09/01/2022 Key: CN-22444 I 94 W GIBBS SEP-5 MI E OF W JCT US 83 (MP: 164.527 to 164.527) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Comments: Bridge replacement work has begun, expect reduced speeds and lane closures from RP 164 to 167. Expected Start: 04/04/2022 Expected End: 09/17/2022 Key: CN-21854 I 94 W JCT ND 30 (MP: 228.321 to 228.321) Type of Work: Bridge Repair Work Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: The Bridge on I-94 Jct ND 30 at Exit 228 is being replaced this construction season. Hwy 30 will be closed through the overpass during most of the spring/summer. Traffic traveling north on Hwy 30 wanting to turn west on I-94 will be detoured east to Exit 230, utilizing the ramps, to travel on I-94 west. Traffic traveling south on Hwy 30 wanting to turn east, will be detoured west to Exit 221, utilizing the ramps, to travel on I-94 east. Traffic traveling on I-94, in both bounds, will be diverted on the off/on ramps when overhead work is taking place on the structure. Traffic control signs & devices will be used as necessary to guide the traveling public through the work zones. Expected Start: 04/21/2022 Expected End: 10/15/2022 Key: CN-22485 I 94 W CLEVELAND INT - JAMESTOWN INT (MP: 238.793 to 238.793) Type of Work: Bridge Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: The passing lane at the bridge on I-94 westbound is closed for bridge repair work. Traffic control devices and signs will be used divert motorists accordingly. Expected Start: 06/09/2022 Expected End: 10/15/2022 Key: CN-23011 I 94 W I-94 - Exit 242 - Windsor Interchange (MP: 242.200 to 242.700) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Bridge repair work is being done on the overpass at Exit 242. The road will be closed through the overpass during construction. Traffic traveling on I-94 east, wanting to travel north on exit 242 will be detoured 3 miles east to exit 245 utilizing the interchange ramps to travel back on I-94 west to get to Exit 242 Northbound. Traffic traveling on I-94 west, wanting to travel south on exit 242 will be detoured to exit 238 utilizing the interchange ramps to travel back on I-94 east to get to Exit 242 Southbound. Traffic traveling on I-94, in both bounds, will be diverted on the off/on ramps when overhead work is taking place on the structure. Traffic control signs & devices will be used as necessary to guide the traveling public through the work zones. Expected Start: 08/12/2022 Expected End: 10/14/2022 Key: MA-100367 I 94 W I-94 - Exit 248 - Lippert Interchange (MP: 248.700 to 249.200) Type of Work: Construction Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Bridge repair work is being done on I-94 at Exit 248. The road will be closed through the overpass during construction. Traffic traveling on I-94 east, wanting to travel north on exit 248 will be detoured 3 miles east to exit 251 utilizing the interchange ramps to travel back on I-94 west to get to Exit 248 Northbound. Traffic traveling on I-94 west, wanting to travel south on exit 248 will be detoured 3 miles west to exit 245 utilizing the interchange ramps to travel back on I-94 east to get to Exit 248 Southbound. Traffic control signs & devices will be used as necessary to guide the traveling public through the work zones. Expected Start: 08/12/2022 Expected End: 10/14/2022 Key: MA-100368 I 94 W James River Bridge on I-94 near Jamestown. RP 259.847 (MP: 259.847 to 259.847) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 13.0 ft. Comments: Bridge Repair work will take place starting in the passing lane. A lane closure will be installed to direct I-94 westbound traffic into the acceleration lane. Motorist should be aware of merging traffic coming from the onramp at this location. Traffic control devices and signs will be used to direct traffic through the work zone. Expected Start: 08/12/2022 Expected End: 10/14/2022 Key: MA-100365 I 94 W W LYNCHBURG INTR TO E KINDRED INTR (MP: 327.717 to 340.779) Type of Work: Miscellaneous Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Comments: Median Shoulder work, I94 Eastbound, Left Lane closure from RP 335.00 to 336.500. I94 westbound left lane closure from RP 337.335 to RP 335.500 Expected Start: 06/01/2022 Expected End: 10/01/2022 Key: CN-23329 I 94 W 6 EAST OF ND 18 - EB/WB (MP: 337.335 to 337.335) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 22.0 ft. Comments: Both directions of I-94 are reduced to one lane and traffic is head-to-head on the westbound roadway across the Maple River at RP 337. Eastbound speed limit reduced to 40 MPH and westbound speed limit reduced to 55 MPH. Expected Start: 03/23/2022 Expected End: 09/10/2022 Key: CN-22319 I 94 W HORACE RD TO 42ND ST SEP-EB/WB (MP: 346.440 to 349.100) Type of Work: Grading Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Comments: I94 from the Sheyenne Interchange to 42nd St Separation the inside shoulder is closed. Lane closure on I94 Westbound from the 42nd St Separation bridge to 45th ST Interchange bridge. On I94 Eastbound there is a lane closure from veterans Blvd to 45th ST Expected Start: 07/28/2022 Expected End: 08/31/2022 Key: CN-22443 I 94 W 42ND ST SEPARATION TO I-29 - EB/WB (MP: 349.089 to 349.530) Type of Work: Miscellaneous Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Comments: Median Work, I94 eastbound lane closure from RP 348.581 (45th St Interchange Bridge) to RP349.580 (I29 Interchange Bridge). I94 westbound shoulder closures from RP 349.860 to 348.500. Speeds reduced to 40 Mph. Expected Start: 07/11/2022 Expected End: 09/01/2022 Key: CN-22444 US 2 E E OF STANLEY TO BLAISDELL - WB (MP: 90.911 to 104.834) Type of Work: Road Construction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Milling and Concrete Overlay of Westbound Lanes from Stanley to Blaisdell will result in reduced speeds and one lane of traffic both directions. Eastbound Passing lane will be closed entire length of project. The Westbound traffic will be shifted to the Easbound Passing Lane. Expect reduced speeds, construction traffic entering and exiting work zone, and one lane of travel for the duration of construction. Expected Start: 05/19/2022 Expected End: 10/10/2022 Key: CN-22067 US 2 E 4 MI W BERTHOLD TO W BND - WB (MP: 117.400 to 120.536) Type of Work: Median Crossover Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: The West bound lane is closed to traffic throughout the length of the project. All traffic is head to head on the East bound lane. Speed limit is 60 mph. Expected Start: 05/09/2022 Expected End: 10/08/2022 Key: CN-22071 US 2 E 2MI W BERTHOLD TO JCT 28-BERTHOLD-EB (MP: 120.536 to 123.407) Type of Work: Median Crossover Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: The East bound lane is now closed to traffic and all traffic is now head to head on the West bound lane throughout the length of the project. Speed limit is 45 mph. Expected Start: 05/09/2022 Expected End: 10/08/2022 Key: CN-22070 US 2 E E OF BERTHOLD TO 3 MI W JCT ND 52-WB (MP: 124.138 to 131.254) Type of Work: Median Crossover Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: The West bound lane is now closed and all traffic is head to head on the East bound lane throughout the length of the project. Speed limit is 60 mph. Expected Start: 05/09/2022 Expected End: 10/08/2022 Key: CN-22069 US 2 E BURDICK EXPRESSWAY TO EVERGREEN AVE (MP: 144.216 to 145.090) Type of Work: Intersection Improvement Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Evergreen Ave And US HWY 2 Right lane closed from RP 145.252 to RP 144.270 Westbound. Right Turn only onto US HWY 2 No Left turn at Evergreen Ave. Right lane closed from RP 143.990 to RP 145.000 Eastbound. Right turn only onto US HWY 2 No Left Turn at Evergreen Ave. Burdick Expressway Right Turn only onto US HWY 2 No Left Turn off Burdick onto US HWY 2. 18th St SW is closed permanently between Elk Drive and US HWY 2. Speed Limit Reduced to 40 MPH through work zone. Lane Width reduced to 14 feet. Expected Start: 07/10/2022 Expected End: 09/27/2022 Key: CN-22829 US 2 E Near Petersburg on US 2, RP 313.5 to 315.0, both EB and WB (MP: 313.200 to 313.200) Type of Work: Road Construction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: 45-55 Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Lane closures and reduced speeds for construction trucks entering and leaving highway. Eastbound and westbound directions. Reduce speed. Expected Start: 06/14/2022 Expected End: 11/11/2022 Key: CN-22278 US 2 W E OF STANLEY TO BLAISDELL - WB (MP: 90.911 to 104.834) Type of Work: Road Construction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Milling and Concrete Overlay of Westbound Lanes from Stanley to Blaisdell will result in reduced speeds and one lane of traffic both directions. Eastbound Passing lane will be closed entire length of project. The Westbound traffic will be shifted to the Easbound Passing Lane. Expect reduced speeds, construction traffic entering and exiting work zone, and one lane of travel for the duration of construction. Expected Start: 05/19/2022 Expected End: 10/10/2022 Key: CN-22067 US 2 W 4 MI W BERTHOLD TO W BND - WB (MP: 117.400 to 120.536) Type of Work: Median Crossover Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: The West bound lane is closed to traffic throughout the length of the project. All traffic is head to head on the East bound lane. Speed limit is 60 mph. Expected Start: 05/09/2022 Expected End: 10/08/2022 Key: CN-22071 US 2 W 2MI W BERTHOLD TO JCT 28-BERTHOLD-EB (MP: 120.536 to 123.407) Type of Work: Median Crossover Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: The East bound lane is now closed to traffic and all traffic is now head to head on the West bound lane throughout the length of the project. Speed limit is 45 mph. Expected Start: 05/09/2022 Expected End: 10/08/2022 Key: CN-22070 US 2 W E OF BERTHOLD TO 3 MI W JCT ND 52-WB (MP: 124.138 to 131.254) Type of Work: Median Crossover Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: The West bound lane is now closed and all traffic is head to head on the East bound lane throughout the length of the project. Speed limit is 60 mph. Expected Start: 05/09/2022 Expected End: 10/08/2022 Key: CN-22069 US 2 W BURDICK EXPRESSWAY TO EVERGREEN AVE (MP: 144.216 to 145.090) Type of Work: Intersection Improvement Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Evergreen Ave And US HWY 2 Right lane closed from RP 145.252 to RP 144.270 Westbound. Right Turn only onto US HWY 2 No Left turn at Evergreen Ave. Right lane closed from RP 143.990 to RP 145.000 Eastbound. Right turn only onto US HWY 2 No Left Turn at Evergreen Ave. Burdick Expressway Right Turn only onto US HWY 2 No Left Turn off Burdick onto US HWY 2. 18th St SW is closed permanently between Elk Drive and US HWY 2. Speed Limit Reduced to 40 MPH through work zone. Lane Width reduced to 14 feet. Expected Start: 07/10/2022 Expected End: 09/27/2022 Key: CN-22829 US 2 W RP 201 TO 1 MILE WEST OF RUGBY (MP: 201.420 to 209.646) Type of Work: Pavement Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Normal Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: Patching and profiling repairs being done. Expected Start: 07/26/2022 Expected End: 09/10/2022 Key: CN-22970 US 2 W Near Petersburg on US 2, RP 313.5 to 315.0, both EB and WB (MP: 313.200 to 313.200) Type of Work: Road Construction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Lane closures and reduced speeds for construction trucks entering and leaving highway. Eastbound and westbound directions. Reduce speed. Expected Start: 06/14/2022 Expected End: 11/11/2022 Key: CN-22278 US 2B E US 2B, GATE AVE TO 2ND AVE W (MP: 900.570 to 901.610) Type of Work: Paving Operations Delays: No Delays Lane Reduction: Reduced to two lanes Travel Speeds: Normal Surface Type: Pavement Restriction(s) associated with work zone: Width - 11.0 ft. Comments: Work that will be on going will be milling the road way followed by an overlay, during the same duration there will be guard rail improvements during the construction work. Expected Start: 08/08/2022 Expected End: 08/29/2022 Key: CN-22906 US 12 AT MARMARTH (MP: 6.555 to 6.555) Type of Work: Bridge Repair Work Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 20.0 ft. Comments: -PROJECT START 7-11-2022. -ROADWAY WILL BE REDUCED TO ONE LANE, WHILE WORK IS BEING DONE ON THE BRIDGE. -TRAFFIC WILL BE DIRECTED BY SIGNAL LIGHTS. Expected Start: 07/11/2022 Expected End: 09/30/2022 Key: CN-22607 US 12 BOWMAN MUNICIPAL SECTION (MP: 33.207 to 34.192) Type of Work: Grading and Paving Delays: 15 minutes or less Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: A 14 foot width restriction is in place for US Hwy 12 between the west and east intersections with US Hwy 85. Also, the east intersection of US Hwy 12 and US Hwy 85 in Bowman, ND will be utilizing a traffic shift with narrow driving lanes. A 12 foot width restriction is in place at the east junction of US 12 and 85.. Turning maneuvers for long vehicles may be impacted. Contractors will be working onsite. Expected Start: 08/10/2022 Expected End: 10/22/2022 Key: CN-22623 US 52 E CARPIO TO BROOKS JCT (MP: 67.910 to 82.099) Type of Work: Chip Sealing Delays: between 15 and 30 minutes Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Loose Chips Comments: Fog sealing operations occurring over both lanes of US 52. Flaggers and pilot car in place to guide single lane traffic through the project limits. Pilot car operation is 4 miles in length. Expected Start: 08/15/2022 Expected End: 08/16/2022 Key: CN-23101 US 52 E CO LINE TO BERGEN (MP: 112.521 to 127.845) Type of Work: Chip Sealing Delays: between 15 and 30 minutes Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Loose Chips Comments: Chip sealing and fog sealing operations occurring over both lanes of US 52. Flaggers and pilot car in place to guide single lane traffic through the project limits. Pilot car operation is 4 miles in length. Expected Start: 08/15/2022 Expected End: 08/18/2022 Key: CN-23100 US 52 E FESSENDEN TO CARRINGTON (MP: 185.548 to 221.698) Type of Work: Shoulder Work Delays: 15 minutes or less Lane Reduction: No Lane Closure Travel Speeds: 45-55 Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Contractor is doing shoulder work from Carrington west to the Jct of 52 & 200 and north to Fessenden. Traffic at work areas will be controlled with flaggers and a pilot car starting Monday August 1st. Expected Start: 07/05/2022 Expected End: 10/22/2022 Key: CN-23151 US 52 E JMSTWN,US 52,END CONCRETE-17TH ST SW (MP: 266.550 to 267.070) Type of Work: Concrete Pavement Repair Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Normal Surface Type: Pavement Restriction(s) associated with work zone: Width - 10.0 ft. Comments: Lane closures on both the EB and WB lanes. Flashing signal for 4-way stop at the intersection of 17th Street and US 52. Expected Start: 07/11/2022 Expected End: 09/30/2022 Key: CN-23350 US 52 W CARPIO TO BROOKS JCT (MP: 67.910 to 82.099) Type of Work: Chip Sealing Delays: between 15 and 30 minutes Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Loose Chips Comments: Fog sealing operations occurring over both lanes of US 52. Flaggers and pilot car in place to guide single lane traffic through the project limits. Pilot car operation is 4 miles in length. Expected Start: 08/15/2022 Expected End: 08/16/2022 Key: CN-23101 US 52 W JMSTWN,US 52,END CONCRETE-17TH ST SW (MP: 266.550 to 267.070) Type of Work: Concrete Pavement Repair Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Normal Surface Type: Pavement Restriction(s) associated with work zone: Width - 10.0 ft. Comments: Lane closures on both the EB and WB lanes. Flashing signal for 4-way stop at the intersection of 17th Street and US 52. Expected Start: 07/11/2022 Expected End: 09/30/2022 Key: CN-23350 US 52B JAMESTOWN BYPASS (MP: 915.000 to 918.500) Type of Work: Bridge Repair Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 13.0 ft. Comments: Bridge Work will be taking place throughout the bypass for the remainder of the summer. Signal lights will be utilized to direct traffic over the bridges when a lane closure is in place. Flaggers, traffic signs, signal lights, and traffic devices will be used to direct traffic through the bypass for the duration of the project. Expected Start: 07/07/2022 Expected End: 10/15/2022 Key: CN-22637 US 81B N GRAND FORKS 32ND AVE AND S 34TH ST (MP: 940.000 to 941.500) Type of Work: Turn Lane Work Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Comments: Signal realignment and turn lane adjustment at S. 34th ST. and 32nd Ave. S.Watch for equipment and workers. Expected Start: 07/25/2022 Expected End: 08/31/2022 Key: CN-21884 US 85 N Intersection of US 85 and US 12 (MP: 16.900 to 18.000) Type of Work: Construction Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: The east intersection of US 12 and US 85 is being reconstructed in phases. Traffic control is in place to maintain two way traffic through the intersection on 12 foot wide lanes. Turning movements for long loads will be difficult. Expected Start: 08/11/2022 Expected End: 09/12/2022 Key: MA-100363 US 85 N 9.7 MI N AMIDON - 25 MI S CTY LINE (MP: 51.098 to 57.055) Type of Work: Chip Sealing Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Chip and fog seal work was recently completed. Expected Start: 08/02/2022 Expected End: 08/27/2022 Key: CN-22355 US 85 N 3 NORTH OF JCT ND 21 (MP: 53.387 to 53.387) Type of Work: Culvert Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Contractor on site working on a pipe placement and liner, all work will be taking place off the roadway. Expected Start: 08/01/2022 Expected End: 09/30/2022 Key: CN-22653 US 85 N US 85 & 38TH ST SW (MP: 73.300 to 73.500) Type of Work: Turn Lane Work Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 13.0 ft. Comments: A right hand turn lane is being added to the south bound lane along US 85 at 38th St SW. Width restriction of 13 ft on the southbound lane only and no restriction on the north bound lane. There are 3.5 ft tall vertical panels placed along southbound edgeline. Expected Start: 07/11/2022 Expected End: 09/12/2022 Key: CN-22832 US 85 N BELFIELD - BNRR SEP N TO S I-94 JCT (MP: 74.825 to 75.645) Type of Work: Grading Work Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 17.0 ft. Comments: US 85 is being widened and is adding Left & Right hand turning lanes between I-94 East bound entrance to south of County Road 10. Width restriction is currently 17ft for US85 southbound lane and 18ft for US85 north bound lane. There are 3.5 ft tall vertical panels installed along edge of asphalt. Expected Start: 07/11/2022 Expected End: 09/12/2022 Key: CN-22254 US 85 N I-94 TO US 85B (MP: 76.000 to 112.000) Type of Work: Pavement Marking Work Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Less than 35 Surface Type: Pavement Comments: RP 75.861 to RP 145.66 Pavement marking grooving on white edge lines along shoulder. Expect minor delays behind protection vehicle and grooving equipment. Pass with care. Expected Start: 08/01/2022 Expected End: 09/30/2022 Key: CN-23340 US 85 N W WATFORD CITY TO JCT ND 68 (MP: 151.000 to 159.348) Type of Work: Shoulder Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: 35-45 Surface Type: Pavement Comments: Shoulder work for new Environmental Sensor Station and Automated Warning System Expected Start: 08/01/2022 Expected End: 10/29/2022 Key: CN-23269 US 85B N WATFORD CITY 2ND AVE SHARED USE PATH (MP: 952.693 to 953.403) Type of Work: Ditch Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Pedestrian Multi-Use Path work is occurring off the roadway and at intersections. Expected Start: 07/07/2022 Expected End: 08/19/2022 Key: CN-22942 US 281 N US 281, N JCT 15 TO N OF SHEYENNE (MP: 128.300 to 139.161) Type of Work: Road Construction Work Delays: between 15 and 30 minutes Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Gravel Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Flaggers and Pilot car in use, some days have two separate operations. Road top is a gravel surface. Shoulder widening in process. Please proceed with caution. Expected Start: 05/05/2022 Expected End: 10/08/2022 Key: CN-21504 ND 1 W JCT I-94 N TO JCT ND 26 - DAZEY (MP: 76.423 to 95.662) Type of Work: Chip Seal Work with Loose Gravel Surface Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Chip Sealcoat and Pavement Markings Expected Start: 08/02/2022 Expected End: 09/16/2022 Key: CN-23435 ND 1 JCT CO RD 8 & 15 TO NEKOMA SPUR (MP: 181.560 to 200.526) Type of Work: Paving Operations Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: Mill & HMA Overlay. Flaggers will be present. Expected Start: 07/22/2022 Expected End: 08/12/2022 Key: CN-22592 ND 3 TUTTLE N TO W JCT 200 (MP: 113.230 to 134.157) Type of Work: Road Widening Work Delays: 15 minutes or less Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Comments: The Contractor will be extending pipes, stripping topsoil on the inslopes and hauling material to widen the roadway. Flaggers and pilot car will guide traffic through the work zone when Contractor is working. Expected Start: 07/13/2022 Expected End: 10/15/2022 Key: CN-18811 ND 3 JCT ND 19 N TO JCT 2 - RUGBY (MP: 177.190 to 201.386) Type of Work: Chip Sealing Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Loose Chips Comments: Project is complete except for Permanent Striping. Expected Start: 07/19/2022 Expected End: 08/31/2022 Key: CN-23440 ND 3 RUGBY-JCT US 2 N TO HWY 66 (MP: 201.421 to 224.336) Type of Work: Paving Operations Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Milling and Paving operation Expected Start: 07/06/2022 Expected End: 09/05/2022 Key: CN-22928 ND 3 ND 3, INTERSECTION OF 66TH ST (MP: 202.830 to 203.000) Type of Work: Grading and Paving Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Less than 35 Surface Type: Pavement Comments: Lane Shift through workzone Expected Start: 07/12/2022 Expected End: 08/31/2022 Key: CN-21983 ND 5 END PCC TO PAR ROAD (MP: 288.966 to 300.100) Type of Work: Paving Operations Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Traffic normal. Expected Start: 07/28/2022 Expected End: 08/06/2022 Key: CN-23477 ND 6 W JCT BIA 7-PORCUPINE TO JCT ND 21 (MP: 22.700 to 42.149) Type of Work: Grading Work Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Comments: The Contractor is hauling material to widen the roadway and replacing topsoil on the inslopes. They are also extending / replacing centerline pipes, and doing subcut work. Portions of the roadway are gravel and reduced to 25 mph. Flaggers and pilot car will guide traffic through the work zone when Contractor is working. Expected Start: 05/10/2022 Expected End: 10/28/2022 Key: CN-22207 ND 8 CO LN N TO JCT OLD 10 W RICHARDTON (MP: 64.928 to 82.391) Type of Work: Chip Sealing Delays: 15 minutes or less Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Comments: Fresh chip seal completed. Expect fresh oil and loose rocks. Expected Start: 06/27/2022 Expected End: 08/15/2022 Key: CN-23376 ND 8 N JCT 200 TO RESERVOIR (MP: 113.807 to 131.252) Type of Work: Chip Sealing Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: 45-55 Surface Type: Pavement Comments: Chip seal was recently completed. Expected Start: 08/03/2022 Expected End: 08/27/2022 Key: CN-23516 ND 8 STANLEY, 2ND AVE NW TO 6TH ST SE (MP: 157.609 to 158.000) Type of Work: Ditch Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Pedestrian shared-use path work is occurring off the roadway and at intersections. Expected Start: 05/31/2022 Expected End: 10/08/2022 Key: CN-22657 ND 10 6 EAST OF ND 18 (MP: 9.983 to 9.986) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Restriction(s) associated with work zone: Width - 0.1 ft. Height - 0.1 ft. Length - 0.1 ft. Comments: ND 10 closed to all traffic at the Maple River (RP 9) for bridge reconstruction. Use alternate routes. Expected Start: 02/28/2022 Expected End: 09/10/2022 Key: CN-22544 ND 11 E JCT 3 - ASHLEY E TO CO LN (MP: 35.157 to 53.233) Type of Work: Road Widening Work Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Work will consist of installing pipes and widening the roadway. The project will progress from the west to the east. Expected Start: 04/25/2022 Expected End: 10/15/2022 Key: CN-22636 ND 15 ND 32 TO E JCT 18 (MP: 89.872 to 114.900) Type of Work: Paving Operations Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Traffic controlled by flagger and pilot car. Expected Start: 08/08/2022 Expected End: 08/26/2022 Key: CN-23474 ND 17 E EDMORE EAST TO JCT 1 (MP: 77.962 to 82.122) Type of Work: Paving Operations Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: Mill & Overlay. Flaggers will be present. Expected Start: 07/28/2022 Expected End: 08/05/2022 Key: CN-22593 ND 18 North edge of Larimore on ND 18 from RP 163.730 to 163.804 (MP: 163.730 to 163.804) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: City of Larimore is installing a double reinforced concrete drainage pipe from the west side of Hwy 18 to the east ditch. The roadway will be removed 1/2 at a time to install and backfill. Traffic will be reduced to one lane, and flaggers present to direct traffic / take turns. The pipe installation will be completed in one day. Temporary gravel surface will be present until bituminous pavement is placed later this week or next week. Expected Start: 08/02/2022 Expected End: 08/09/2022 Key: MA-100362 ND 20 N JAMESTOWN, 1ST AVE N TO 12TH AVE NE (MP: 0.000 to 1.374) Type of Work: Paving Operations Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: ND 20 from 1st Ave to 12th Ave is down to one lane in each direction width a 12 width. Work is to be done to the two inside lanes and traffic is moved to the outside. Expected Start: 06/14/2022 Expected End: 08/06/2022 Key: CN-23177 ND 20 N DEVILS LAKE (US 2 TO 20TH ST NE) (MP: 102.655 to 104.408) Type of Work: Paving Operations Delays: 15 minutes or less Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Milling has started with paving to start around August 11th. Expected Start: 08/04/2022 Expected End: 09/16/2022 Key: CN-22907 ND 20 S JAMESTOWN, 1ST AVE N TO 12TH AVE NE (MP: 0.000 to 1.374) Type of Work: Paving Operations Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: ND 20 from 1st Ave to 12th Ave is down to one lane in each direction width a 12 width. Work is to be done to the two inside lanes and traffic is moved to the outside. Expected Start: 06/14/2022 Expected End: 08/06/2022 Key: CN-23177 ND 22 N E JCT US 12 N TO NEW ENGLAND (MP: 16.186 to 47.573) Type of Work: Chip Sealing Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: No work in progress. Chip seal was recently completed. Permanent striping will follow soon. Expected Start: 07/28/2022 Expected End: 08/27/2022 Key: CN-23375 ND 22 N ND 22 RP 47.221 (MP: 46.971 to 47.471) Type of Work: Construction Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.5 ft. Comments: Road construction in progress. There is a width restriction of 16.5' for each lane (north and southbound lane) at this location. Expected Start: 05/11/2022 Expected End: 10/22/2022 Key: MA-100353 ND 22 N N NEW ENGLAND N TO 8TH ST-DICKINSON. (MP: 47.572 to 68.660) Type of Work: Grading and Paving Delays: 15 minutes or less Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Comments: Traffic reduced to to 35 MPH at the Antelope Creek Bridge (RP 59.973) due to uneven pavement between the bridge and the approach.Grading operations. Flaggers and pilot cars on site to direct traffic Delays less than 15 minutes. Expected Start: 06/25/2022 Expected End: 10/22/2022 Key: CN-22621 ND 22 N S OF DICKINSON, HEART RIVER BRIDGE (MP: 70.275 to 70.275) Type of Work: Bridge Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Bridge open to two way traffic on east half of bridge. Ongoing work on the west half of the bridge. Expected Start: 06/27/2022 Expected End: 09/27/2022 Key: CN-22913 ND 24 JCT ND 6 TO S FORT YATES (MP: 0.000 to 8.855) Type of Work: Chip Sealing Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Pilot Car and Flagger operation beginning Wednesday or Thursday August 17 or 18 Expected Start: 08/17/2022 Expected End: 09/15/2022 Key: CN-22808 ND 27 JCT 1 E TO JCT 32 LISBON (MP: 0.000 to 18.999) Type of Work: Paving Operations Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Micro-Surfacing Operation completed on 7/15. Rumble Strip Installation scheduled for 7/30-8/2. Expect reduced speeds and lane reduction during working hours with flaggers & pilot car in operation. Permanent Pavement Markings scheduled for mid-August. Expected Start: 06/27/2022 Expected End: 08/19/2022 Key: CN-23438 ND 30 NORTH OF US 52 - PIPESTEM CREEK (MP: 88.503 to 88.503) Type of Work: Road Construction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Roadway is closed to the public. The existing bridge is being replaced with a box culvert. A detour route is in place around the construction area. Expected Start: 06/13/2022 Expected End: 10/08/2022 Key: CN-22602 ND 31 HANNOVER N TO W JCT 200A (MP: 95.646 to 108.650) Type of Work: Chip Sealing Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: 45-55 Surface Type: Pavement Comments: Flagging and pilot car operation at work zone Expected Start: 08/08/2022 Expected End: 09/16/2022 Key: CN-23186 ND 32 JCT I-94 N TO JCT 38 - HOPE (MP: 75.982 to 104.086) Type of Work: Chip Seal Work with Loose Gravel Surface Delays: 15 minutes or less Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Comments: Chip Sealcoat and Pavement Markings Expected Start: 08/02/2022 Expected End: 09/16/2022 Key: CN-23436 ND 35 MICHIGAN TO JCT 17 ADAMS (MP: 0.667 to 27.256) Type of Work: Shoulder Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Normal Surface Type: Pavement Comments: Pavement marking remaining. Expected Start: 06/06/2022 Expected End: 08/19/2022 Key: CN-23144 ND 46 JCT ND 30 TO JCT US 281 (MP: 0.160 to 30.656) Type of Work: Pavement Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Fog Sealing grind spots. Expected Start: 06/30/2022 Expected End: 06/30/2022 Key: CN-23143 ND 66 DISTRICT BNDRY E TO N JCT 32 (MP: 93.830 to 94.300) Type of Work: Guardrail Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Work in progress. Rumble strips, pavement marking remaining. Expected Start: 07/18/2022 Expected End: 08/26/2022 Key: CN-23296 ND 67 SCRANTON N TO JCT 21 (MP: 0.000 to 27.466) Type of Work: Road Construction Work Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Normal Surface Type: Gravel Comments: Subcut work thru City of Scranton RP 0.16 to RP 0.66. Expect flaggers and reduced to 1-lane traffic. Expect loose gravel driving surface thru City of Scranton. Expected Start: 07/07/2022 Expected End: 09/30/2022 Key: CN-22940 ND 200 West of Dunn Center. (MP: 89.000 to 99.000) Type of Work: Construction Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Shoulder work installing Delineators, Mobile Operation with Protection Vehicle in place, East & Westbound lane. Expected Start: 08/28/2022 Expected End: 08/28/2022 Key: MA-100359 ND 200 JCT ND 49 TO KINEMAN CREEK (MP: 143.511 to 157.081) Type of Work: Road Construction Work Delays: 15 minutes or less Lane Reduction: No Lane Closure Travel Speeds: 45-55 Surface Type: Pavement Comments: Chip Seal work was recently completed. Expected Start: 08/04/2022 Expected End: 08/27/2022 Key: CN-23517 ND 297 E GRAND FORKS DEMERS AVE OVERPASS (MP: 2.692 to 2.692) Type of Work: Bridge Repair Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Less than 35 Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Traffic reduced to 1 lane in each direction.reduced speed, watch for workers and equipment.Expect delays. Expected Start: 06/27/2022 Expected End: 09/23/2022 Key: CN-23191 ND 297 W GRAND FORKS DEMERS AVE OVERPASS (MP: 2.692 to 2.692) Type of Work: Bridge Repair Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Less than 35 Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Traffic reduced to 1 lane in each direction.reduced speed, watch for workers and equipment.Expect delays. Expected Start: 06/27/2022 Expected End: 09/23/2022 Key: CN-23191 ND 1806 HEART RIVER TO MAIN ST (MP: 69.384 to 70.087) Type of Work: Concrete Pavement Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Restriction(s) associated with work zone: Width - 11.0 ft. Comments: Bridge deck overlay, Concrete pavement repair. Lane width reduced. No left turns on ND 1806 onto 3rd St SE. Expected Start: 04/25/2022 Expected End: 09/30/2022 Key: CN-22903