North Dakota Reported Work Zones Last Updated at: 7/26/2024 2:39:58 PM I 29 N 32ND AVE INTERCHANGE (MP: 137.500 to 138.506) Type of Work: Lighting Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Intermittent shoulder closures within the work Zone. Both Northbound and Southbound directions.On-ramps and off-ramps Expected Start: 07/08/2024 Expected End: 10/26/2024 Key: CN-24057 I 29 N JUNCTION US 2 (MP: 141.000 to 141.000) Type of Work: Road Construction Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: The NB & SB RT Lanes are closed for road construction work with a 16' width restriction for both directions. The NW Exit Ramp has a width restriction of 12'. The Speed Limit is reduced to 60 mph and 40 mph when workers are present. Expected Start: 04/03/2024 Expected End: 09/07/2024 Key: CN-22785 I 29 N Interstate 29 near MP 148 - both directions (MP: 147.000 to 149.000) Type of Work: Construction Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Traffic is head-to-head on the southbound roadway. Traffic speed is reduced to 40 mph. Delays are negligible. Expected Start: 05/20/2024 Expected End: 09/20/2024 Key: MA-100493 I 29 N I-29, RP 158.200 to 172.040 NB & RP 161.200 to 170.502 SB (MP: 159.000 to 159.000) Type of Work: Fencing Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Fence repairs in progress. Expected Start: 04/09/2024 Expected End: 08/16/2024 Key: CN-23683 I 29 N Deck replacement at structure over I-29, Exit 168. Pipe replacement W of interchange. (MP: 167.000 to 167.700) Type of Work: Bridge Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: 35-45 Surface Type: Pavement Restriction(s) associated with work zone: Width - 15.0 ft. Comments: Lane closure and speed reduced on northbound and southbound. Overhead structure closed at exit 168. See detour signs. Expected Start: 05/20/2024 Expected End: 09/06/2024 Key: CN-23636 I 29 N LAGOON FENCING (MP: 179.000 to 179.000) Type of Work: Fencing Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Shoulder closure will be in place near the Alexander Henry Rest Area. Expected Start: 07/22/2024 Expected End: 07/26/2024 Key: CN-24224 I 29 S ND 13 N TO RP 33.5 - SB (MP: 22.581 to 33.500) Type of Work: Road Construction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 20.0 ft. Comments: Traffic will be restricted to the driving lane with widths reduced to 20 FT. Lane closures are delineated with signs and devices. Speeds are reduced to 40 MPH when workers are present. Uneven pavement is present and is delineated with signs. Speed is reduced to 40 MPH along the segments of uneven pavement. Wahpeton/Morton interchange ramps at RP 23 will be split. Width restricted to 12 FT on ramps Expected Start: 04/02/2024 Expected End: 10/12/2024 Key: CN-23534 I 29 S 32ND AVE INTERCHANGE (MP: 137.500 to 138.506) Type of Work: Lighting Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Intermittent shoulder closures within the work Zone. Both Northbound and Southbound directions.On-ramps and off-ramps Expected Start: 07/08/2024 Expected End: 10/26/2024 Key: CN-24057 I 29 S JUNCTION US 2 (MP: 141.000 to 141.000) Type of Work: Road Construction Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: The NB & SB RT Lanes are closed for road construction work with a 16' width restriction for both directions. The NW Exit Ramp has a width restriction of 12'. The Speed Limit is reduced to 60 mph and 40 mph when workers are present. Expected Start: 04/03/2024 Expected End: 09/07/2024 Key: CN-22785 I 29 S Interstate 29 near MP 148 - both directions (MP: 147.000 to 149.000) Type of Work: Construction Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 20.0 ft. Comments: Traffic is head-to-head on the southbound roadway. Traffic speed is reduced to 40 mph. Delays are negligible. Expected Start: 05/20/2024 Expected End: 09/20/2024 Key: MA-100493 I 29 S I-29, RP 158.200 to 172.040 NB & RP 161.200 to 170.502 SB (MP: 159.000 to 159.000) Type of Work: Fencing Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Fence repairs in progress. Expected Start: 04/09/2024 Expected End: 08/16/2024 Key: CN-23683 I 29 S Deck replacement at structure over I-29, Exit 168. Pipe replacement W of interchange. (MP: 167.000 to 167.700) Type of Work: Bridge Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: 35-45 Surface Type: Pavement Restriction(s) associated with work zone: Width - 15.0 ft. Comments: Lane closure and speed reduced on northbound and southbound. Overhead structure closed at exit 168. See detour signs. Expected Start: 05/20/2024 Expected End: 09/06/2024 Key: CN-23636 I 29 S N OF JCT 66 N TO CANADIAN LINE (MP: 207.000 to 217.517) Type of Work: Paving Operations Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Lane closure from RP 217.517 to 207.0 Left lane closure NB near RP 217 for a construction truck traffic to turn around. Speed limit reduced to 40 MPH through active work zone. Crews also working on interchange ramps and crossroads. Watch for workers, flaggers, and equipment on the roadway. Expected Start: 04/30/2024 Expected End: 09/21/2024 Key: CN-24128 I 94 E STATE LINE TO E CAMEL HUMP DAM - EB (MP: 0.000 to 11.841) Type of Work: Road Construction Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 21.0 ft. Comments: Road work in progress. Traffic is head-to-head on the westbound roadway of I-94. Speed is reduced to 65 mph. Watch for equipment exiting roadway. Expected Start: 03/19/2024 Expected End: 10/26/2024 Key: CN-22956 I 94 E I-94 near Home on the Range Bridge (MP: 7.360 to 7.370) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.5 ft. Comments: Roadwork in progress. Traffic is head-to-head on the westbound I-94 roadway. At approx RP 7.360, width restriction is 14.5 ft for eastbound motorists and 21 ft for westbound motorists. Expected Start: 04/05/2024 Expected End: 10/26/2024 Key: MA-100486 I 94 E 7 WEST OF ND 49 - EAGLES NEST INT (MP: 102.914 to 102.914) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 30.0 ft. Comments: County Road 139 closed beneath interchange. Follow detour routes. Head-to-head traffic on I-94. Expected Start: 03/13/2024 Expected End: 11/09/2024 Key: CN-22610 I 94 E GRANT MARSH BRDG - E BIS INTERCHANGE (MP: 156.609 to 157.328) Type of Work: Bridge Repair Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: 35-45 Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Traffic will be switched to outside lanes in each direction on July 8th and then switched to head to head on Eastbound Structure on July 10th. Northbound Expressway to Eastbound I-94 ramp will remain closed for duration of project. Expected Start: 03/07/2024 Expected End: 10/19/2024 Key: CN-22603 I 94 E CENTENNIAL RD/BIS EXP INTERCHANGE Exit 161 (MP: 161.439 to 161.439) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Trucks Entering Road at Miriam Ave. Expected Start: 05/15/2024 Expected End: 11/29/2024 Key: CN-22648 I 94 E Driscoll, ND Overhead Bridge (MP: 190.110 to 190.110) Type of Work: Construction Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Comments: RP 190.110, overhead bridge closed for deck replacement. Eastbound and westbound Interstate 94 to remain open. Northbound and southbound travelers to use posted detour route. Expected Start: 06/17/2024 Expected End: 10/19/2024 Key: MA-100506 I 94 E I-94 JCT CMC 0837 (MP: 190.110 to 190.110) Type of Work: Bridge Repair Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Comments: East and West Bound Traffic will be detoured over the on/off ramps as crews work under the overpass. Speeds will be reduced for these detours over the ramps. Expected Start: 06/24/2024 Expected End: 06/29/2024 Key: CN-23371 I 94 E Robinson, ND Overhead Bridge (MP: 205.071 to 205.071) Type of Work: Construction Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Height - 15.0 ft. Comments: RP 205.071, overhead bridge closed for deck replacement. Eastbound and westbound Interstate 94 to remain open. Northbound and southbound travelers to use posted detour route. Expected Start: 06/16/2024 Expected End: 10/19/2024 Key: MA-100504 I 94 E SE JAMESTOWN INTERCHANGE (MP: 260.125 to 260.125) Type of Work: Bridge Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: 45-55 Surface Type: Pavement Restriction(s) associated with work zone: Width - 13.0 ft. Comments: I-94 Eastbound will be closed for bridge repair work. Motorists traveling east will be shifted to I-94 westbound, utilizing crossovers, where head to head traffic will take place for the duration of the project. I-94 eastbound will be open to traffic to be used as a ramp to get off at exit 260 only. Traffic control signs and devices will be used to direct traffic through the work zone. Expected Start: 04/15/2024 Expected End: 10/26/2024 Key: CN-23577 I 94 E 3 WEST OF ND 18 (MP: 328.710 to 328.710) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 28.0 ft. Height - 15.8 ft. Comments: The shoulders in both directions of I-94 are closed at Exit 328 - Lynchburg Interchange. The speed limit is reduced to 60 MPH. The crossroad is closed to all traffic, follow posted detour routes. Expected Start: 03/28/2024 Expected End: 09/28/2024 Key: CN-23808 I 94 E I-94 East and West Bound From RP 342.1 to RP 342.3 (MP: 342.100 to 342.600) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: 45-55 Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: I-94 East and West Bound Lane Closures. Speeds Reduced. Expected Start: 04/18/2024 Expected End: 06/30/2024 Key: MA-100488 I 94 W STATE LINE TO E CAMEL HUMP DAM - EB (MP: 0.000 to 11.841) Type of Work: Road Construction Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 21.0 ft. Comments: Road work in progress. Traffic is head-to-head on the westbound roadway of I-94. Speed is reduced to 65 mph. Watch for equipment exiting roadway. Expected Start: 03/19/2024 Expected End: 10/26/2024 Key: CN-22956 I 94 W I-94 near Home on the Range Bridge (MP: 7.360 to 7.370) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 21.0 ft. Comments: Roadwork in progress. Traffic is head-to-head on the westbound I-94 roadway. At approx RP 7.360, width restriction is 14.5 ft for eastbound motorists and 21 ft for westbound motorists. Expected Start: 04/05/2024 Expected End: 10/26/2024 Key: MA-100486 I 94 W 7 WEST OF ND 49 - EAGLES NEST INT (MP: 102.914 to 102.914) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: County Road 139 closed beneath interchange. Follow detour routes. Head-to-head traffic on I-94. Expected Start: 03/13/2024 Expected End: 11/09/2024 Key: CN-22610 I 94 W GRANT MARSH BRDG - E BIS INTERCHANGE (MP: 156.609 to 157.328) Type of Work: Bridge Repair Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: 35-45 Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Traffic will be switched to outside lanes in each direction on July 8th and then switched to head to head on Eastbound Structure on July 10th. Northbound Expressway to Eastbound I-94 ramp will remain closed for duration of project. Expected Start: 03/07/2024 Expected End: 10/19/2024 Key: CN-22603 I 94 W I-94 JCT CMC 0837 (MP: 190.110 to 190.110) Type of Work: Bridge Repair Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Comments: East and West Bound Traffic will be detoured over the on/off ramps as crews work under the overpass. Speeds will be reduced for these detours over the ramps. Expected Start: 06/24/2024 Expected End: 06/29/2024 Key: CN-23371 I 94 W Driscoll, ND Overhead Bridge (MP: 190.110 to 190.110) Type of Work: Construction Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Comments: RP 190.110, overhead bridge closed for deck replacement. Eastbound and westbound Interstate 94 to remain open. Northbound and southbound travelers to use posted detour route. Expected Start: 06/17/2024 Expected End: 10/19/2024 Key: MA-100506 I 94 W Robinson, ND Overhead Bridge (MP: 205.071 to 205.071) Type of Work: Construction Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Height - 15.0 ft. Comments: RP 205.071, overhead bridge closed for deck replacement. Eastbound and westbound Interstate 94 to remain open. Northbound and southbound travelers to use posted detour route. Expected Start: 06/16/2024 Expected End: 10/19/2024 Key: MA-100504 I 94 W SE JAMESTOWN INTERCHANGE (MP: 260.125 to 260.125) Type of Work: Bridge Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: 45-55 Surface Type: Pavement Restriction(s) associated with work zone: Width - 13.0 ft. Comments: I-94 Eastbound will be closed for bridge repair work. Motorists traveling east will be shifted to I-94 westbound, utilizing crossovers, where head to head traffic will take place for the duration of the project. I-94 eastbound will be open to traffic to be used as a ramp to get off at exit 260 only. Traffic control signs and devices will be used to direct traffic through the work zone. Expected Start: 04/15/2024 Expected End: 10/26/2024 Key: CN-23577 I 94 W 3 WEST OF ND 18 (MP: 328.710 to 328.710) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 28.0 ft. Height - 16.0 ft. Comments: The shoulders in both directions of I-94 are closed at Exit 328 - Lynchburg Interchange. The speed limit is reduced to 60 MPH. The crossroad is closed to all traffic, follow posted detour routes. Expected Start: 03/28/2024 Expected End: 09/28/2024 Key: CN-23808 I 94 W I-94 East and West Bound From RP 342.1 to RP 342.3 (MP: 342.100 to 342.600) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: 45-55 Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: I-94 East and West Bound Lane Closures. Speeds Reduced. Expected Start: 04/18/2024 Expected End: 06/30/2024 Key: MA-100488 US 2 E INTERMITTENT LOCATIONS FROM STATE LINE TO WILLISTON US 85. (MP: 7.500 to 9.000) Type of Work: Grading and Paving Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: 35-45 Surface Type: Pavement Restriction(s) associated with work zone: Width - 13.0 ft. Comments: RP 7.5 to RP 9.0. Expect lane closures with reduced speeds from 6:30am - 7:30pm weekdays and Saturday starting July 15. Flaggers and Pilot car in use. Expect delays. Be aware of traffic control devices near the road shoulder in various segments from RP 0.01 to RP 14.5 Expected Start: 07/22/2024 Expected End: 07/26/2024 Key: CN-23007 US 2 E STATE LINE TO NEAR JCT US Hwy 85 - EB/WB (MP: 9.000 to 12.250) Type of Work: Road Construction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: 35-45 Surface Type: Pavement Restriction(s) associated with work zone: Width - 13.0 ft. Comments: Expect significant delays at times on weekdays and Saturdays. Expect single lane closures where all traffic is diverted into either the WB or EB lane. Flaggers and pilot car in use. Traffic will be impacted from US Hwy 2 & US 85 junction, west to RP 7.5. Use alternate route if possible. Expected Start: 07/25/2024 Expected End: 07/27/2024 Key: CN-23908 US 2 E West of HWY 2/52 Junction and approximately 1 mile east of HWY 52 to HWY 2 east bound entrance ramp. (MP: 133.184 to 135.000) Type of Work: Culvert Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: 35-45 Surface Type: Pavement Restriction(s) associated with work zone: Width - 11.0 ft. Length - 95.0 ft. Comments: Traffic is head to head in the east bound lanes. Speed reduced to 40 mph through project. Expected Start: 05/22/2024 Expected End: 09/09/2024 Key: CN-22609 US 2 E 1.5 MI E TOWNER TO BERWICK (MP: 197.902 to 199.902) Type of Work: Concrete Pavement Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Concrete pavement repair, reduced speed, reduced to one lane, width restriction of 14ft Expected Start: 05/29/2024 Expected End: 08/16/2024 Key: CN-22920 US 2 E BERWICK TO 1 MI W OF RUGBY (MP: 199.902 to 204.000) Type of Work: Concrete Pavement Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: Concrete Pavement Repair, reduced to one lane, reduced speed, width restriction of 16ft Expected Start: 07/08/2024 Expected End: 08/16/2024 Key: CN-22921 US 2 E RUGBY FRONTAGE ROAD EXTENSION (MP: 212.200 to 212.400) Type of Work: Shoulder Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: North shoulder of the West bound traffic will be closed off and speed limits reduced to 25 MPH when work is occurring on the shoulder. 6th Ave SE will also be closed going North of HWY 2 and will require taking a detour on Country Road. Expected Start: 04/29/2024 Expected End: 08/03/2024 Key: CN-23510 US 2 E W LEEDS E TO CHURCHS FERRY (MP: 236.673 to 242.825) Type of Work: Concrete Pavement Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Concrete Pavement Repair, US 2 EB reduced to one lane, width restriction of 14ft, speed reduced Expected Start: 05/08/2024 Expected End: 08/09/2024 Key: CN-23469 US 2 W STATE LINE TO NEAR JCT US Hwy 85 - EB/WB (MP: 9.000 to 12.250) Type of Work: Road Construction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: 35-45 Surface Type: Pavement Restriction(s) associated with work zone: Width - 13.0 ft. Comments: Expect significant delays at times on weekdays and Saturdays. Expect single lane closures where all traffic is diverted into either the WB or EB lane. Flaggers and pilot car in use. Traffic will be impacted from US Hwy 2 & US 85 junction, west to RP 7.5. Use alternate route if possible. Expected Start: 07/25/2024 Expected End: 07/27/2024 Key: CN-23908 US 2 W West of HWY 2/52 Junction and approximately 1 mile east of HWY 52 to HWY 2 east bound entrance ramp. (MP: 133.184 to 135.000) Type of Work: Culvert Repair Work Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: 35-45 Surface Type: Pavement Restriction(s) associated with work zone: Width - 11.0 ft. Length - 95.0 ft. Comments: Traffic is head to head in the east bound lanes. Speed reduced to 40 mph through project. Expected Start: 05/22/2024 Expected End: 09/09/2024 Key: CN-22609 US 52 E MINOT TO E OF BALFOUR (MP: 101.683 to 140.000) Type of Work: Road Widening Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Crews working on shoulder for pavement markings, minor earthwork, and seeding. Use caution when passing. Expected Start: 05/01/2023 Expected End: 07/01/2024 Key: CN-23149 US 52 E E OF BALFOUR TO FESSENDEN (MP: 140.000 to 185.548) Type of Work: Road Construction Work Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Construction of turning lanes and passing lanes will be occurring at various locations. Flaggers and pilot cars will be utilized in the active work areas. Expected Start: 04/22/2024 Expected End: 10/26/2024 Key: CN-23150 US 81B N GF, US 81 FROM I-29 TO WASHINGTON ST (MP: 940.000 to 941.852) Type of Work: Concrete Pavement Repair Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Less than 35 Surface Type: Pavement Restriction(s) associated with work zone: Width - 11.0 ft. Length - 70.0 ft. Comments: CPR on US 81B/32ND AVE S from HEARTLAND DR to COLUMBIA ROAD Expected Start: 06/03/2024 Expected End: 07/31/2024 Key: CN-24023 US 81B N WASHINGTON ST-5TH AVE S TO 1ST AVE N (MP: 944.000 to 944.000) Type of Work: Reconstruction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Less than 35 Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Reduced speeds. Head to head traffic in Southbound lanes, expect delays.Trucks use designated alternate routes. Expected Start: 04/30/2024 Expected End: 11/08/2024 Key: CN-22167 US 81B S WASHINGTON ST-5TH AVE S TO 1ST AVE N (MP: 944.000 to 944.000) Type of Work: Reconstruction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Less than 35 Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Reduced speeds. Head to head traffic in Southbound lanes, expect delays.Trucks use designated alternate routes. Expected Start: 04/30/2024 Expected End: 11/08/2024 Key: CN-22167 US 83 N 1 mile south of Linton. (MP: 24.500 to 25.000) Type of Work: Construction Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.5 ft. Height - 17.5 ft. Comments: Reduced to one lane for deck overlay. 12.5' width restriction. 17.5¿ height restriction Expected Start: 07/23/2024 Expected End: 10/19/2024 Key: MA-100513 US 83 N BISMARCK STATE ST (I-94 TO CALGARY) (MP: 88.998 to 90.000) Type of Work: Road Construction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: NB State St closed from Divide Avenue to Calgary Avenue Expected Start: 04/14/2023 Expected End: 05/15/2024 Key: CN-22770 US 83 N WASHBURN N TO N JCT 200 - NB (MP: 128.013 to 147.556) Type of Work: Preventive Maintenance Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: In the next several days, pavement marking operations will be in progress. Drive with caution. Expected Start: 05/30/2024 Expected End: 07/31/2024 Key: CN-23461 US 83 N Northbound lanes of US 83 across the Snake Creek Embankment (MP: 155.750 to 157.250) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 18.0 ft. Comments: Lane closure in place for work on pipeline in east ditch. Watch for trucks entering and exiting the workzone. Speeds reduced. Expected Start: 05/01/2024 Expected End: 08/30/2024 Key: MA-100492 US 83 S BISMARCK STATE ST (I-94 TO CALGARY) (MP: 88.998 to 90.000) Type of Work: Road Construction Work Delays: No Delays Lane Reduction: Reduced to two lanes Travel Speeds: Normal Surface Type: Pavement Comments: NB State St closed from Divide Avenue to Calgary Avenue Expected Start: 04/14/2023 Expected End: 05/15/2024 Key: CN-22770 US 83 S WASHBURN N TO N JCT 200 - SB (MP: 128.013 to 147.556) Type of Work: Preventive Maintenance Delays: No Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: Sealing work is being performed on the asphalt shoulders and within the asphalt medians. Work is expected to be completed within one or two days, starting 7/23. Expected Start: 07/23/2024 Expected End: 07/25/2024 Key: CN-23460 US 83B N BISMARCK STATE ST (DIVIDE TO I-94) (MP: 901.850 to 902.646) Type of Work: Road Construction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: No Lane Reductions or Closures Expected Start: 04/14/2023 Expected End: 05/15/2024 Key: CN-22769 US 83B S BIS, 7TH ST (BIS EXPWY - FRONT AVE) (MP: 900.000 to 900.625) Type of Work: Preventive Maintenance Delays: Expect Delays Lane Reduction: Reduced to two lanes Travel Speeds: Less than 35 Surface Type: Pavement Comments: Maintenance includes updating ADA ramps, varying curb & gutter repair, updating street lighting luminaires, and a mill and overlay of the mainline. Access to Target and the Event Center will be maintained at all times. Expected Start: 05/01/2024 Expected End: 08/09/2024 Key: CN-23201 US 83B S BISMARCK STATE ST (DIVIDE TO I-94) (MP: 901.850 to 902.646) Type of Work: Road Construction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: No Lane Reductions or Closures Expected Start: 04/14/2023 Expected End: 05/15/2024 Key: CN-22769 US 85 N 85-067.675 Bridge. (MP: 67.675 to 67.675) Type of Work: Construction Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Structure work will be starting on 5/30/24 for a bridge deck overlay and approach slab reconstruction. Traffic will have reduced speeds and be reduced to one lane, with traffic signals directing the traffic flow while work is taking place. Expected Start: 05/30/2024 Expected End: 08/30/2024 Key: MA-100496 US 85 N TRNP ENTRANCE - CO RD 30(23RD ST NW) (MP: 127.210 to 139.428) Type of Work: Reconstruction Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: reconstruction Expected Start: 03/25/2024 Expected End: 10/31/2024 Key: CN-22683 ND 6 SELFRIDGE N TO W JCT BIA 7-PORCUPINE (MP: 11.500 to 22.700) Type of Work: Grading Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Work in roadway ditches and trucks turning onto highway. Paved surface is fully open to normal travel speeds Expected Start: 04/25/2023 Expected End: 11/17/2023 Key: CN-22206 ND 8 8-003.883 Bridge (MP: 3.883 to 3.883) Type of Work: Construction Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Structure work will be starting on 5/30/24 for a bridge deck overlay and guardrail updating. Traffic will have reduced speeds and be reduced to one lane, with traffic signals directing the traffic flow while work is taking place. A width restriction of 12.0 feet is in place while work is on going. Expected Start: 05/31/2024 Expected End: 08/17/2024 Key: MA-100498 ND 8 ND 8 RP 87.236, 10 miles north of junction of I-94 (MP: 87.236 to 87.236) Type of Work: Construction Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Less than 35 Surface Type: Gravel Restriction(s) associated with work zone: Width - 12.0 ft. Comments: One lane traffic controlled by temporary signals and flaggers. Speed reduced to 25 MPH thru work zone Expected Start: 05/28/2024 Expected End: 08/16/2024 Key: MA-100495 ND 8 10 NORTH JCT I-94 (MP: 90.657 to 90.657) Type of Work: Bridge Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: 45-55 Surface Type: Pavement Comments: Work being performed along shoulder. Expect reduced speed Expected Start: 07/22/2024 Expected End: 07/31/2024 Key: CN-24076 ND 9 5 MILES SOUTH OF WIMBLEDON (MP: 41.500 to 42.200) Type of Work: Road Construction Work Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: 35-45 Surface Type: Gravel Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Work being conducted on roadway, shoulder, and ditches Expected Start: 05/14/2024 Expected End: 08/15/2024 Key: CN-23142 ND 10B E WEST FARGO MAIN AVENUE SLIDE REPAIR (MP: 934.470 to 934.700) Type of Work: Landslide Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: Construction in progress. WB Drive Lane (outside) closed. Width Restricted to 12'. Expected Start: 06/24/2024 Expected End: 08/02/2024 Key: CN-23288 ND 10B W WEST FARGO MAIN AVENUE SLIDE REPAIR (MP: 934.470 to 934.700) Type of Work: Landslide Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Construction in progress. WB Drive Lane (outside) closed. Width Restricted to 12'. Expected Start: 06/24/2024 Expected End: 08/02/2024 Key: CN-23288 ND 11 ND 11, 5TH AVE SW TO 3RD AVE NE (MP: 35.157 to 35.668) Type of Work: Reconstruction Work Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Gravel Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Gravel surfacing on roadway. Expected Start: 05/28/2024 Expected End: 07/26/2024 Key: CN-22937 ND 13 E NEAR MOORETON (MP: 374.500 to 378.000) Type of Work: Shoulder Work Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Comments: Work in and beyond the shoulders taking place. Expected Start: 04/02/2024 Expected End: 08/16/2024 Key: CN-23141 ND 14 STERLING TO WING (MP: 0.000 to 21.289) Type of Work: Road Reconstruction Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Expect Delays. Lane closures will be in place starting 4/22/24. Traffic will be reduced to one lane through the active workzone.Starting July 29th a width restriction of 11 ft will be in place through August 2nd. Expected Start: 04/15/2024 Expected End: 10/05/2024 Key: CN-23273 ND 18 8 NORTH OF LEONARD, MAPLE RIVER (MP: 64.955 to 64.955) Type of Work: Bridge Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Traffic on ND18 will be diverted to a bypass around the Maple River Bridge. The bypass has 14-foot lane widths, and speeds are reduced to 25 MPH. Expected Start: 03/20/2024 Expected End: 10/19/2024 Key: CN-23279 ND 22 N 22-006.171 structure (MP: 6.171 to 6.171) Type of Work: Construction Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Comments: Structure work will be starting on 7/8/24 for bridge abutment and pier repairs. Traffic will have reduced speeds and be reduced to one lane, with traffic signals directing the traffic flow while work is taking place. Expected Start: 07/08/2024 Expected End: 08/05/2024 Key: MA-100512 ND 22 N 22-045.841 Structure (MP: 45.841 to 45.841) Type of Work: Construction Delays: 15 minutes or less Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Structure work will be starting on 5/30/24 for a bridge deck overlay and guardrail updating. Traffic will have reduced speeds and be reduced to one lane, with traffic signals directing the traffic flow while work is taking place. A width restriction of 12.0 feet is in place while work is on going. Expected Start: 05/30/2024 Expected End: 08/17/2024 Key: MA-100497 ND 22 N ND 22, 8TH ST S TO 15TH ST N (MP: 69.658 to 72.057) Type of Work: Curb and Gutter Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Less than 35 Surface Type: Pavement Comments: Curb and sidewalk replacements. Expect temporary sidewalk pedestrian ramps. Expect narrowed driving lanes at intersections and occasional flaggers. Speed reduced to 25mph. Expected Start: 05/16/2024 Expected End: 09/16/2024 Key: CN-23203 ND 22 N KILLDEER BYPASS TO LOST BRIDGE (MP: 109.518 to 126.100) Type of Work: Paving Operations Delays: between 15 and 30 minutes Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 16.0 ft. Comments: Shoulder work and paving near RP 117. Flagger and pilot car in use. Expect delays. Expected Start: 05/02/2024 Expected End: 10/19/2024 Key: CN-23546 ND 22 S ND 22, 8TH ST S TO 15TH ST N (MP: 69.658 to 72.057) Type of Work: Curb and Gutter Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Less than 35 Surface Type: Pavement Comments: Curb and sidewalk replacements. Expect temporary sidewalk pedestrian ramps. Expect narrowed driving lanes at intersections and occasional flaggers. Speed reduced to 25mph. Expected Start: 05/16/2024 Expected End: 09/16/2024 Key: CN-23203 ND 22B N KILLDEER BUSINESS LOOP (MP: 940.466 to 945.518) Type of Work: Curb and Gutter Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: No work at this time. Expected Start: 04/30/2024 Expected End: 10/19/2024 Key: CN-23299 ND 23 E ND 23 Watford (MP: 1.500 to 3.900) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to two lanes Travel Speeds: Reduced Surface Type: Pavement Comments: Shoulder closure at intersection of ND 23 and 12th St SE for underground utility installation. Expected Start: 07/08/2024 Expected End: 07/19/2024 Key: MA-100511 ND 23 E WATFORD CITY DRAINAGE IMPROVEMENTS (MP: 3.701 to 5.360) Type of Work: Shoulder Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: The work will be in the ditch for the lift station and pipe installation, there may be some areas that may require some reduced speed. Expected Start: 07/17/2024 Expected End: 10/25/2024 Key: CN-22949 ND 23 E JCT 8 E TO JCT 28 (MP: 56.405 to 87.261) Type of Work: Paving Operations Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 20.0 ft. Comments: Paving operations have started with work taking place near the Jct. of Hwy 28, moving west. Watch for flaggers, equipment and workers on the road. Expected Start: 07/17/2024 Expected End: 08/24/2024 Key: CN-23473 ND 23 W ND 23 Watford (MP: 1.500 to 3.900) Type of Work: Construction Delays: No Delays Lane Reduction: Reduced to two lanes Travel Speeds: Reduced Surface Type: Pavement Comments: Shoulder closure at intersection of ND 23 and 12th St SE for underground utility installation. Expected Start: 07/08/2024 Expected End: 07/19/2024 Key: MA-100511 ND 31 ND 31, MP 29.2. Near the town of Raleigh. (MP: 29.200 to 29.200) Type of Work: Construction Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Gravel Comments: Expect work along the shoulders and intermediate flagging. Speed reduced to 45mph through work zone. Expected Start: 06/10/2024 Expected End: 07/29/2024 Key: MA-100503 ND 32 ND 32, 11 NORTH OF NIAGARA/JCT US 2 (MP: 174.000 to 174.000) Type of Work: Culvert Repair Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Less than 35 Surface Type: Pavement Comments: Traffic back on main roadway. Speeds reduced to 25. Expected Start: 04/18/2024 Expected End: 08/15/2024 Key: CN-23659 ND 32 W JCT 5 N TO WALHALLA (MP: 219.556 to 230.638) Type of Work: Road Reconstruction Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Gravel Restriction(s) associated with work zone: Width - 12.0 ft. Comments: Pavement removal is completed. Traffic is driving on gravel surface through out the project. Speed limit has been reduced to 45 mph. Flaggers and pilot cars will be used during working hours. Be prepared to stop. Expected Start: 06/10/2024 Expected End: 10/12/2024 Key: CN-23210 ND 41 ND 41 RP 8.7 (MP: 8.500 to 9.000) Type of Work: Construction Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 11.5 ft. Height - 17.5 ft. Comments: Reduced to one lane for deck overlay. 11.5' width restriction. Expected Start: 07/23/2024 Expected End: 10/19/2024 Key: MA-100514 ND 49 HEART BUTTE DAM N TO GLEN ULLIN (MP: 48.180 to 67.710) Type of Work: Road Widening Work Delays: between 15 and 30 minutes Lane Reduction: No Lane Closure Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Widening work started at the south end on 5/15/24 and is progressing towards the North. Pilot car/flaggers are present for gravel and borrow hauling. Signalized one lane roadway at one to two locations at this time due to centerline pipe replacements. Hauling and pipe operations taking place. Continual updates to follow as work progresses. Expected Start: 05/15/2024 Expected End: 10/18/2024 Key: CN-24116 ND 66 ND 66- JCT 30 S & E TO BISBEE (MP: 19.635 to 33.000) Type of Work: Road Construction Work Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Pavement Restriction(s) associated with work zone: Width - 14.0 ft. Comments: Project consists of subgrade repairs and asphalt overlay. Milled asphalt and gravel surfaces present. Proceed with caution. Expected Start: 05/23/2024 Expected End: 07/31/2024 Key: CN-23606 ND 73 Hwy 73 from MP 5.8 to the intersection of ND 22 (MP: 5.800 to 11.332) Type of Work: Grading and Paving Delays: Expect Delays Lane Reduction: Reduced to one lane Travel Speeds: Reduced Surface Type: Gravel Comments: Roadway is closed to through traffic starting 4/15/2024. Expected re opening is 9/30/2024 Expected Start: 06/08/2023 Expected End: 11/01/2024 Key: CN-22361 ND 1804 N JCT ND 37 EMMET COR W&N TO RAUB JCT (MP: 185.218 to 213.688) Type of Work: Pavement Removal Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: All major work items completed. Watch for mobile working crews for rumble strip and permanent striping work. Expected Start: 06/17/2024 Expected End: 07/22/2024 Key: CN-23472 ND 1804 N NEW TOWN, 7TH ST N TO UQC TRAVEL CTR (MP: 247.145 to 248.542) Type of Work: Ditch Work Delays: No Delays Lane Reduction: No Lane Closure Travel Speeds: Normal Surface Type: Pavement Comments: There will be sidewalk work going on alongside the roadway. Should not impact the traveling public. Expected Start: 07/17/2024 Expected End: 10/12/2024 Key: CN-23396 ND 1806 31ST ST NW TO JCT 23B (MP: 306.900 to 311.315) Type of Work: Shoulder Work Delays: Expect Delays Lane Reduction: No Lane Closure Travel Speeds: Less than 35 Surface Type: Gravel Restriction(s) associated with work zone: Width - 11.0 ft. Comments: Traffic has been switch to temporary roadway. Expected Start: 04/08/2024 Expected End: 10/19/2024 Key: CN-21176